Code requires that i have a 36 x36 landing pad outside each exterior door.
Concrete landing front door.
You ll need roughly a day to excavate build forms mix concrete pour and finish the pad s surface.
Deep in the direction of travel with an exception for juliet balconies accessed only by door and the landing can be sloped for drainage or construction tolerance up to 1 4 in.
A typical pad has a 4 inch layer of gravel underneath and about 4 inches of concrete on top.
Doors other than the required egress door shall be provided with landings or floors not more than 7 3 4 inches 196 mm below the top of the threshold.
When building a landing for deck stairs typical codes require the pad to extend beyond the steps about 36 inches behind the steps about 12 inches and on the sides of the steps about 6 inches.
Stamped or stenciled patterns engraving exposed aggregate finishes colored concrete and concrete staining are just a few of the ways you can enhance your sidewalk.
The slab and walk up is about 18 from the ground.
With concrete the decorative options for entrance walks are endless.
Before you begin determine the location for the pad and remove any sod.
Make sure you re able to check for level and square mix concrete and smooth out a concrete surface.
A top landing is not required where a stairway of not more than two risers is located on the exterior side of the door provided that the door does not swing over the stairway.